
Specify it as part of the system
This assembly should not be selected from a photograph or a single headline dimension. Its mechanical interfaces, duty cycle, electrical architecture and control timing must be reviewed against the target sorter and real parcel envelope.
Engineering inputs
- Supply voltage, rated and peak load
- Roller diameter, face width and shaft interface
- Required belt speed, acceleration and duty cycle
- Connector, control method and thermal limit
Evidence to confirm before release
- Controlled interface drawing and revision status
- Representative load and operating-cycle test
- Electrical and controls compatibility, where applicable
- Wear limits, replacement method and spare-parts identification
- Factory acceptance criteria linked to the complete sorter
About published specifications
Dimensions, load limits, speed and electrical ratings vary by project configuration. Parcel Sort Lab therefore does not present unverified catalogue values as universal product limits. MANZUN can confirm the applicable drawing and test scope after receiving the project inputs.