Tools & resources

Make the first conversation more useful with a shared set of planning inputs.

01

Sorter Selection Worksheet

Capture parcel mix, performance targets, footprint and integration boundaries.

Build the brief online
Worksheet
02

Site Survey Checklist

Review access, building, utilities, operations, safety and system interfaces.

Open guide
Checklist

Throughput planning calculator

Use this as a first-pass estimate, then validate every assumption with operational data and an engineering review.

Planning estimate8,000 parcels/hour

Average discharge demand: about 200 parcels per destination per hour.

Planning aid only. Induction efficiency, recirculation, parcel spacing, scan success, destination profile and redundancy must be validated during engineering.