INTEGRATION REVIEW
Define the interfaces before selecting parts.
- 01System voltage and peak current
- 02Contact pressure, wear and contamination
- 03Isolation, protection and maintenance access
01

3P center-feed connector
Confirm conductor profile, phase assignment, current rating, insulation, fastening and feed location before integration.
Check interface and supply02

3P connector
Use controlled joint alignment and electrical continuity criteria to avoid local heating and collector wear.
Check interface and supply03

Carbon brush
Current density, contact pressure, rail finish, contamination and replacement criteria drive service performance.
Check interface and supply04

Current collector arm
Spring force, travel, brush holder, cable routing and safe isolation must suit rail tolerances and line speed.
Check interface and supplyNeed a matched component package?
Send the target sorter architecture, drawings, quantity and operating conditions. MANZUN can review compatibility at assembly level.
Start an engineering enquiry